Close Menu
    Facebook X (Twitter) Instagram
    News Analysis India
    Facebook X (Twitter) Instagram
    • World
    • India
      • Chhattisgarh
      • Jharkhand
      • Madhya Pradesh
      • Bihar
    • Sports
    • Tech
    • Entertainment
    • Business
    • Health
    News Analysis India
    Home»India»Bandikui-Jaipur Expressway Opens: 67-KM Route Completed After Delays, Cutting Travel Time to 30 Minutes
    India

    Bandikui-Jaipur Expressway Opens: 67-KM Route Completed After Delays, Cutting Travel Time to 30 Minutes

    News Analysis IndiaBy News Analysis IndiaJune 22, 20251 Min Read
    WhatsApp Facebook Twitter Copy Link Reddit Threads Email
    Bandikui-Jaipur Expressway Opens: 67-KM Route Completed After Delays, Cutting Travel Time to 30 Minutes
    Share
    Copy Link WhatsApp Twitter Facebook Telegram Threads Email

    The much-anticipated Bandikui-Jaipur Expressway has been completed, approximately eight months behind schedule. The 67-km expressway is designed to facilitate travel between Bandikui and Jaipur in just 30 minutes. The project, which cost around ₹1,368 crore, is a four-lane access-controlled highway, permitting speeds of up to 120 kmph.

    The route spans across two districts, with 32.7 km in Dausa and 34.1 km in Jaipur. Five toll plazas have been constructed, including a virtual plaza at Shyamsinghpura. Motorists will be charged approximately ₹150 for a one-way trip. Originally slated for completion by November 2024, the project faced delays but now the construction work is complete, and the required road safety audit has also been done. The inauguration date is pending approval from the Union Road Transport Ministry.

    It is anticipated that the expressway will be open to the public by June 2025. Its opening will significantly reduce travel time between Bandikui and Jaipur while improving connectivity to Delhi-NCR. This new corridor will begin at Bagrana on the Jaipur-Agra Road, enabling travelers heading towards Delhi to reach their destination within two and a half to three hours.

    Bandikui Delhi-NCR Expressway Infrastructure Jaipur Rajasthan Road construction Toll Plaza Transportation Travel Time
    Share. Facebook Twitter Pinterest Telegram Email Copy Link Reddit WhatsApp Threads

    Related News

    Abu Bakr Siddiqui Charged by NIA in Andhra Explosives Bust

    India February 6, 2026

    President Smt. Droupadi Murmu to inaugurate ‘Bastar Pandum-2026’ on February 7

    Chhattisgarh February 6, 2026

    Development works will be approved according to local needs and public aspirations: Chief Minister Mr. Vishnu Deo Sai

    Chhattisgarh February 6, 2026

    DGCA’s approval for Bilaspur Airport’s All Weather Operation will give new momentum to Chhattisgarh’s development: Chief Minister Shri Vishnu Deo Sai

    Chhattisgarh February 6, 2026

    Bhilwara Water Bodies: NGT Mandates Urgent Encroachment Clearance

    India February 6, 2026

    Bihar Ministers Praise Vaibhav’s U19 Final Heroics

    India February 6, 2026
    -Advertisement-
    News Analysis India
    Facebook X (Twitter) Instagram
    • About
    • Contact
    • Terms & Conditions
    • Privacy Policy
    © 2026 News Analysis India. All Rights Reserved

    Type above and press Enter to search. Press Esc to cancel.