Close Menu
    Facebook X (Twitter) Instagram
    News Analysis India
    Facebook X (Twitter) Instagram
    • World
    • India
      • Chhattisgarh
      • Jharkhand
      • Madhya Pradesh
      • Bihar
    • Sports
    • Tech
    • Entertainment
    • Business
    • Health
    News Analysis India
    Home»India»Bhopal Railway Overbridge Redesign Underway Following Public Criticism
    India

    Bhopal Railway Overbridge Redesign Underway Following Public Criticism

    News Analysis IndiaBy News Analysis IndiaAugust 29, 20252 Mins Read
    WhatsApp Facebook Twitter Copy Link Reddit Threads Email
    Bhopal Railway Overbridge Redesign Underway Following Public Criticism
    Share
    Copy Link WhatsApp Twitter Facebook Telegram Threads Email

    The controversial 90-degree railway overbridge (ROB) in Bhopal is slated for a redesign, prompted by significant public criticism and media attention. The Central Expert Committee has advised improvements to the bridge’s hazardous design, specifically recommending an increase in the turn radius from 6 meters to 16.7 meters. This modification aims to eliminate the sharp turn, enhancing safety for heavy vehicles. The overbridge connects heavily populated areas like Aishbagh, experiencing substantial daily traffic. Design flaws have caused persistent traffic jams and increased accident risks, leading to sustained complaints from residents and commuters. The recommended changes are expected to provide considerable relief to those affected. A new detailed project report (DPR) will be prepared based on the committee’s recommendation, and submitted to the state government and the Municipal Corporation. The redesign will be overseen by the railways and the construction agency, with officials stating minimal impact on the project timeline. Initially budgeted at Rs 17.37 crore, the ROB project commenced on May 21, 2022, with an original completion target of August 2024, though it remains unfinished as of August 2025. Following the viral spread of images highlighting the bridge’s issues in June, Chief Minister Mohan Yadav intervened, resulting in the suspension of eight engineers and blacklisting of the construction agency and design firm.

    Bhopal Construction Engineering Infrastructure Mohan Yadav Public Backlash Railway Overbridge Redesign Safety Concerns Traffic Congestion
    Share. Facebook Twitter Pinterest Telegram Email Copy Link Reddit WhatsApp Threads

    Related News

    Abu Bakr Siddiqui Charged by NIA in Andhra Explosives Bust

    India February 6, 2026

    President Smt. Droupadi Murmu to inaugurate ‘Bastar Pandum-2026’ on February 7

    Chhattisgarh February 6, 2026

    Development works will be approved according to local needs and public aspirations: Chief Minister Mr. Vishnu Deo Sai

    Chhattisgarh February 6, 2026

    DGCA’s approval for Bilaspur Airport’s All Weather Operation will give new momentum to Chhattisgarh’s development: Chief Minister Shri Vishnu Deo Sai

    Chhattisgarh February 6, 2026

    Bhilwara Water Bodies: NGT Mandates Urgent Encroachment Clearance

    India February 6, 2026

    Bihar Ministers Praise Vaibhav’s U19 Final Heroics

    India February 6, 2026
    -Advertisement-
    News Analysis India
    Facebook X (Twitter) Instagram
    • About
    • Contact
    • Terms & Conditions
    • Privacy Policy
    © 2026 News Analysis India. All Rights Reserved

    Type above and press Enter to search. Press Esc to cancel.